在安装电动卷帘门时需注意的要点

来源:http://www.jnyuqilin.com/  发布时间:2023-03-07 10:44:50

在安装电动卷帘门需要注意的事项你知道有什么吗?如下济南电动卷帘门安装维修人员为您介绍一下在安装电动卷帘门的时候需注意的几个要点:
Do you know what to pay attention to when installing the electric roller shutter door? The installation and maintenance personnel of Jinan electric roller shutter door will introduce some key points for you to pay attention to when installing the electric roller shutter door:
1、复核洞口与产品尺寸是否相符,防火卷帘门的洞口尺寸,可根据3M。
1. Check whether the hole size is consistent with the product size, and the hole size of the fire shutter door can be based on 3M.
2、确定安装水平线及垂直线,按设定尺寸依次安装.槽口尺寸应准确,上下保持一致,对应槽口应在同一平面内,然后用连接件与洞口内的预埋件焊牢。
2. Determine the installation horizontal line and vertical line, and install them in sequence according to the set size. The notch size should be accurate, consistent from top to bottom, and the corresponding notch should be in the same plane, and then use the connector to weld firmly with the embedded parts in the hole.
3、卷门机必须按说明书要求安装。
3. The door roller must be installed according to the instructions.
4、卷轴、文架板必须牢固地装在混凝土结构上或预埋件上。
4. The reel and document shelf plate must be firmly installed on the concrete structure or embedded parts.
5、宽大门体需在中间位置加装中柱,两边有滑道.中柱安装必须与地面垂直,安装牢固,但要拆装方便。
5. The wide door body needs to be installed with a central pillar in the middle, with a slide on both sides. The central pillar must be installed vertically with the ground and firmly, but it should be easy to disassemble.
6、门体叶片插入滑道不得少于30mm,门体宽度偏差为土3mm。
6. The gate blade shall be inserted into the slide at least 30mm, and the gate width deviation shall be 3mm.
7、防火卷帘门水幕系统装在防护理下面,喷嘴倾斜15°角。
7. The water curtain system of the fireproof rolling shutter door is installed under the anti-care, and the nozzle is inclined at an angle of 15 °.
8、安装完略,先手动调'自试运行,观察门体上下运行情况,正常后通电调试。
8. After installation, first manually adjust the self-test run, observe the operation of the door body up and down, and then power on the commissioning after it is normal.
9、观察卷帘机、传动系统、门体运行情况应启闭正常、顺畅,速度为3-7米/分钟。
9. Observe the operation of the roller shutter, transmission system and door body. The opening and closing shall be normal and smooth, and the speed shall be 3-7 m/min.
济南电动卷帘门安装维修
10、调整制动器外壳方向,使环形链朝下;调整链条张紧度,链条6-10mm;调整单向调节器及限位器。
10. Adjust the direction of the brake housing so that the annular chain is downward; Adjust the chain tension, the chain is 6-10mm; Adjust the one-way regulator and limiter.
11、卷筒安装应先找好尺寸,并使卷简轴保持水平位置。注意与导轨之间的距离应两端保将一致,临时固定后进行检查,并进行必要的调篷、校正,无误后再与支架预埋件用电焊焊接。
11. When installing the drum, first find the size and keep the winding shaft in a horizontal position. Note that the distance between the guide rail and the guide rail should be the same at both ends. After temporary fixing, check it, adjust and correct it, and then weld it with the embedded parts of the support by electric welding.
12、清理、粉刷或镶砌导轨墙体装饰面层,清理现场。
12. Clean, paint or inlay the decorative surface of the guide rail wall, and clean the site.
在安装电动卷帘门时需注意的要点就讲解完毕了,感谢您的阅读,希望给您好的帮助,更多使用事项就来我们网站http://www.jnyuqilin.com咨询了解吧!