电动卷帘门安装要注意哪些参数?
1、复核洞口与产品尺寸是否相符,防火卷帘门的洞口尺寸,可根据3M。
1. Recheck whether the hole size is consistent with the product size. The hole size of fireproof rolling shutter door can be determined according to 3m.
2、确定安装水平线及垂直线,按设定尺寸依次安装.槽口尺寸应准确,上 下保持一致,对应槽口应在同一平面内,然后用连接件与洞口内的预埋件焊牢。
2. Determine the installation horizontal line and vertical line, and install them in sequence according to the set size. The notch size shall be accurate, consistent up and down, and the corresponding notch shall be in the same plane, and then weld the connector with the embedded parts in the hole.
3、卷门机必须按说明书要求安装。
3. The door rolling machine must be installed according to the instructions.
4、卷轴、文架板必须牢固地装在混凝土结构上或预埋件上。
4. The reel and document frame plate must be firmly installed on the concrete structure or embedded parts.
5、宽大门体需在中间位置加装中柱,两边有滑道.中柱安装必须与地面垂 直,安装牢固,但要拆装方便。
5. The wide door body needs to be equipped with a center column in the middle, with slides on both sides. The center column must be installed perpendicular to the ground, firmly installed, but easy to disassemble.
6、门体叶片插入滑道不得少于30 mm,门体宽度偏差为土3 mm。
6. The insertion of the gate blade into the slide shall not be less than 30 mm, and the width deviation of the gate body shall be 3 mm.
7、防火卷帘门水幕系统装在防护理下面,喷嘴倾斜15°角。
7. The water curtain system of fireproof rolling shutter door is installed under the anti-corrosion protection, and the nozzle is inclined at an angle of 15 °.
8、安装完略,先手动调'自试运行,观察门体上下运行情况,正常后通电调试。
8. After installation, manually adjust the "self commissioning" first, observe the up and down operation of the door body, and then power on for commissioning after it is normal.
9、观察卷帘机、传动系统、门体运行情况应启闭正常、顺畅,速度为3-7 米/分钟。
9. Observe the operation of the rolling shutter machine, transmission system and door body. The opening and closing shall be normal and smooth, and the speed shall be 3-7M / min.
10、调整制动器外壳方向,使环形链朝下;调整链条张紧度,链条6-10 mm;调整单向调节器及限位器。
10. Adjust the direction of the brake housing so that the annular chain faces down; Adjust the chain tension, 6-10 mm; Adjust the one-way regulator and limiter.
11、卷筒安装应先找好尺寸,并使卷简轴保持水平位置。注意与导轨之间的距离应两端保将一致,临时固定后进行检查,并进行必要的调篷、校正,无误后再与支架预埋件用电焊焊接。
11. When installing the drum, first find the size and keep the winding shaft horizontal. Note that the distance between the guide rail and the guide rail shall be consistent at both ends. After temporary fixing, it shall be checked, and necessary adjustment and correction shall be carried out. After it is correct, it shall be welded with the embedded parts of the support by electric welding.
12、清理、粉刷或镶砌导轨墙体装饰面层,清理现场。
12. Clean, paint or inlay the decorative surface of guide rail wall, and clean the site.